Verex MONITOR AFx Podręcznik Użytkownika Strona 36

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 324
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 35
30
MONITOR AFx™ Director V4.1 User's Guide
500-9041 v4.1
Attendance Periods
Attendance periods are weekly blocks of time
that allow time & attendance reports to 'know'
when users are supposed to be in the facility.
Schedules for cardholder access must
span
a larger
period of time than the applicable attendance period--to
let people enter the facility before their shift begins, and
leave after it ends.
Adding (Setting up) an Attendance
Period
Select
Time & Attendance Schedule
from
your MyTools bar,
or
click
[Reports]
in the
'tree', open the
Time and Attendance
branch,
and select
Attendance Period
.
Multi-Account Systems: Select the desired account
near the centre of the screen.
Tip:
This option
appears only if you didn't already have an account
'open' in the tree.
Now, click
[+]
at the bottom of the form, or
right-click the form, and select
Add New
from
the pop-up menu.
Alternative: You can also select a blank/grey item from
the list (bottom of the form). Note: Grid view does not
apply to this screen.
The attendance period is shown graphically,
for Sunday through Saturday. Add a new time-
interval by right-clicking a specific day, and
selecting
Create New Time Interval
.
Then, drag the interval and/or its end-points to
the desired location.
Tip:
Copying, pasting,
and deleting is also allowed when you right-
click a specific time-interval.
Repeat this process until the desired times are
set up for all days in the attendance period.
(You can use up to 6 unique time intervals
throughout each schedule.)
Now refer to the selection-descriptions for this
screen for additional information.
Tip:
You can copy all settings for an attendance
period, and paste them into another one: In the 1
st
one,
right-click near the bottom of the form, and select
Copy
.
Then, select a blank/new attendance period from the
list, right-click near the bottom of the form, and select
Paste
. After 'pasting', change the name and any
settings as desired.
Note:
'Copy' and 'P
aste' are also
available from the
Edit
menu.
Viewing or Changing Settings for a
Required-Attendance Period
Select
Time & Attendance Schedule
from
your MyTools bar,
or
click
[Reports]
in the
'tree', open the
Time and Attendance
branch,
and select
Attendance Period
.
Multi-Account Systems: Select the desired account
near the centre of the screen.
Now, choose the desired attendance period
from the list (bottom of the form), and refer to
the selection-descriptions for this screen while
viewing and/or changing settings as desired.
Deleting an Attendance Period
Select
Time & Attendance Schedule
from
your MyTools bar,
or
click
[Reports]
in the
'tree', open the
Time and Attendance
branch,
and select
Attendance Period
.
Multi-Account Systems: Select the desired account
near the centre of the screen.
Now, choose the desired attendance period
from the list (bottom of the form). Then, right-
click a blank area near the bottom, and select
Delete
. When asked to confirm, choose
Yes
.
Required-Attendance Time-Periods
Przeglądanie stron 35
1 2 ... 31 32 33 34 35 36 37 38 39 40 41 ... 323 324

Komentarze do niniejszej Instrukcji

Brak uwag